Research record

Lab Notebook

Wet-lab and dry-lab entries in chronological order — protocols, observations, computational analyses, and results as they happened. Negative and inconclusive results are preserved honestly.

Confirmed In progress Pending

Week of 15 June 2026

Mon 15 Jun

Competent cell prep — first attempt (unused)

Wet lab Both Confirmed
Tue 16 Jun

GH10 & GH1 catalytic residue analysis; cellobiose docking

Dry lab Both Confirmed
Tue 16 Jun

CxnA transformation & Gel #1 (inconclusive)

Wet lab Both Confirmed
Wed 17 Jun

Interaction analysis — PLIP, PoseView & Notenboom cross-check

Dry lab Both Confirmed
Wed 17 Jun

Miniprep setup & Gel #2 (inconclusive)

Wet lab Both Confirmed
Thu 18 Jun

AlphaFold3 validation — RMSD = 0.293 Å vs 1FHD

Dry lab Both Confirmed
Thu 18 Jun

Miniprep completion, Gel #3 & sequencing

Wet lab Both Confirmed
Fri 19 Jun

Binding affinity analysis (Vina) & MSA planning

Dry lab Both Confirmed

Week of 22 June 2026

Mon 22 Jun

HotSpot Wizard — mutagenesis target identification

Dry lab Project A Confirmed
Mon 22 Jun

Media preparation — M9, cellobiose & selection plates

Wet lab Both Confirmed
Tue 23 Jun

Selection plate pouring — conditions B, C, D

Wet lab Both Confirmed
Wed 24 Jun

CxnA activity assay setup; CMC & MUC plate prep

Wet lab Both Confirmed
Thu 25 Jun

FoldX stability analysis — candidate mutations ranked

Dry lab Project A Confirmed
Thu 25 Jun

Positive control transformation & activity results

Wet lab Both Confirmed
Fri 26 Jun

Activity assay analysis

Wet lab Both Confirmed

Week of 29 June 2026

Mon 29 Jun

Competent cell prep (planned)

Wet lab Both Confirmed
Tue 30 Jun

epPCR library generation & construction

Wet lab Both Confirmed
Wed 1 Jul

Library transformation & chloramphenicol selection

Wet lab Both Confirmed
Thu 2 Jul

Survivor selection

Wet lab Both Confirmed
Fri 3 Jul

Cellobiose selection, miniprep & sequencing

Wet lab Both Confirmed

Week of 6 July 2026

Mon 6 Jul

GC-rich PCR optimisation and M9 plate prep

Wet lab Both Confirmed
Tue 7 Jul

Transforming BL21 with beta-glucosidase plasmid

Wet lab Both Confirmed
Wed 8 Jul

Mutant sequences back; BL21 re-transformation; M9 control plates browned

Wet lab Both Confirmed
Thu 9 Jul

Redo M9 plates, faithful PCR, and cellobiose selection plates

Wet lab Both Confirmed
Fri 10 Jul

Primer mix-up blocks gene PCR; M9 plate dilution-factor correction

Wet lab Both Confirmed

Week of 13 July 2026

Wed 15 Jul

M9 beta-glucosidase transformant plates — unexpected growth pattern

Wet lab Both Confirmed
Thu 16 Jul

M9 beta-glucosidase plates redone; glycerol stock OD600 check

Wet lab Both Confirmed
Fri 17 Jul

No growth on beta-glucosidase M9 plates — planning a supplement gradient

Wet lab Both Confirmed

Week of 20 July 2026

Tue 21 Jul

M9 supplement-gradient plates designed (casamino acids / thiamine / leucine)

Wet lab Both Confirmed

Week of 10 August 2026

Mon 10 Aug

Overnight CxnA culture started for M9 growth-curve work

Wet lab Both Confirmed
Tue 11 Aug

M9 growth-curve screen — testing supplement essentiality

Wet lab Both Confirmed
Wed 12 Aug

M9 growth-curve screen repeated for consistency

Wet lab Both Confirmed
Thu 13 Aug

Cellobiose vs glucose comparison — CxnA and beta-glucosidase strains

Wet lab Both Confirmed
Fri 14 Aug

24h culture OD600 readings and CFU serial dilution plating

Wet lab Both Confirmed

Week of 17 August 2026

Mon 17 Aug

CFU counts from the cellobiose/glucose comparison

Wet lab Both Confirmed
Tue 18 Aug

MUC assay setup — CxnA baseline (lysis, protein quant, plate loading)

Wet lab Project B Confirmed
Wed 19 Aug

MUC assay Run 1 — first plate, standard curve inverted

Wet lab Both Confirmed
Thu 20 Aug

Q5 backbone PCR — template titration

Wet lab Both Confirmed
Fri 21 Aug

Q5 PCR reclone, gel extraction, and miniprep 6

Wet lab Both Confirmed

Week of 24 August 2026

Tue 25 Aug

MUC assay Run 2 — corrected standard curve, matrix effects characterised

Wet lab Both Confirmed

Week of 31 August 2026

Mon 31 Aug

MUC assay Run 3 — mixing-ratio design fixes the linearity problem

Wet lab Both Confirmed
Thu 3 Sept

MUC assay Run 4 — temperature control added, plate-warming artefact found

Wet lab Both Confirmed
Fri 4 Sept

Congo red screen, miniprep, and digestion of colonies 3 & 5

Wet lab Both Confirmed

Week of 7 September 2026

Mon 7 Sept

Gel extraction of the manganese-gradient epPCR product, Gibson assembly, and transformation

Wet lab Both Confirmed
Tue 8 Sept

Run 5 — first combined MUC + MUG plate; MUG half compromised

Wet lab Both Confirmed
Wed 9 Sept

X-gluc and Congo red applied to the codon-optimised plates

Wet lab Both Confirmed
Fri 11 Sept

20 CMC plates poured

Wet lab Both Confirmed

Week of 14 September 2026

Mon 14 Sept

OD readings for the full CO/T colony set and controls

Wet lab Both Confirmed
Tue 15 Sept

Run 6 — MUG mystery resolved: wrong substrate, not a real signal

Wet lab Both Confirmed
Wed 16 Sept

X-gluc read — colonies picked for sequencing, miniprep list drawn up

Wet lab Both Confirmed

Week of 21 September 2026

Mon 21 Sept

Primer design for epPCR libraries — CxnA plasmid reconstruction and Gibson assembly

Dry lab Both Confirmed
Tue 22 Sept

Miniprep of colony 3

Wet lab Both Confirmed
Wed 23 Sept

Run 7 — the quantitative screen: CO12 sits at the detection threshold

Wet lab Both Confirmed
Thu 24 Sept

Plasmid dilution and primer prep — sequencing sent off

Wet lab Both Confirmed